Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Leveling siding starter strip.
A water level is simply a clear plastic hose or regular hose with clear ends with water in it.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
Description documents this vinyl starter strip is used prior to installing the first row of siding and helps keep siding level and straight.
To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.
Family handyman use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
This is where the new siding will begin.
You attach the bottom of the first row of siding to the top of this starter strip.
A hand level won t cut it and how do you level a chalk line.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
Vinyl siding starter strips.
Then find your lowest point of the home.
This way you will always end level with your soffit.
You will still be able to attach it to the wall sheathing.
A line level isn t accurate enough.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
Pull a measurement down from the soffit.
It protects the sheathing from rain snow and pests.
Pull this same measurement on each corner.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.